Accelerated Time-to-Revenue for a 100MW ERCOT Battery Storage Project

Transmission lines in front of sunset

FlexGen’s One Touch Commissioning approach enabled a 100MW ERCOT BESS site to reach commercial operation months ahead of a smaller 10MW comparison project utilizing a different EMS platform

Not all energy management systems (EMS) are created equal, especially when it comes to commissioning utility-scale battery energy storage projects. A major energy storage developer in Texas was simultaneously commissioning two projects with different EMS providers: a 100 MW / 200 MWh battery energy storage system supported by FlexGen and a smaller 10 MW project supported by another provider. Despite the difference in project size, both faced complex commissioning requirements to reach commercial operation efficiently.

FlexGen leveraged its HybridOS energy management system and One Touch Commissioning approach to streamline project execution and accelerate operational readiness. Despite being ten times larger, the FlexGen-supported project reached commercial operation months ahead of the smaller project, demonstrating how an effective commissioning approach can shorten project timelines and accelerate the path to revenue.

What You'll Learn

  • How One Touch Commissioning reduces deployment risks and streamlines project execution.
  • How pre-deployment testing accelerates utility-scale BESS commissioning.
  • How accelerated commissioning shortens time-to-revenue and supports project economics. 

View Case Study